气井带压作业装置
Your current location : Home >> News >> Industry News

ContactContact

Yancheng Dagang Petroleum Tools Factory Co., Ltd.

Chairman:Li Zhongbiao

Cell Phonee:13905103695   

Sales Manager:Li Hao

Cell Phonee:18261221619

Supervisor:Wu Hanhua      

Cell Phonee:13770022508

Sales Manager:Wu Bin       

Cell Phonee:18001581009

Phone: 0515-88807370 

Fax: 0515-88807228

E-mail:zb@zhongbiaocn.com

Address:No.888 Weiyi Road, Dagang Town, Yandu District, Yancheng City

Current status and development of working equipment under pressure

2020-12-05 09:49:09
a

Current status and development of working equipment under pressure

Pressurized operation is an advanced downhole operation technology that maintains a certain pressure in the wellbore, does not pressure (wash) the well, and does not release the pressure. The pipe string is raised and lowered, and the stimulation measures are implemented. The main advantage is that it can greatly reduce Pollution to the formation and energy loss, high efficiency, safety and reliability, and can meet the requirements of energy saving and emission reduction at the well site. Pressure operation technology has been widely used abroad, and a series of pressure operation devices have been developed, and a relatively complete Supporting technology system. Corresponding research has also been carried out in China, gradually popularized and applied, and certain results have been achieved.

The label

0
Fast Navigation

Navigation

Service Hotline:0515-88807370    0515-88807228

Email :zb@zhongbiaocn.com

Company Address:No.888 Weiyi Road, Dagang Town, Yandu District, Yancheng City                      Su ICP No. 2021000848

Disclaimer: Some of the content pictures on this site are from the Internet. If there is any infringement, please contact the administrator to delete it, thank you!